**Q:**How long does AEOD typically take to complete?

**A:**This will depend on the amount of data at the site.

**Q:**Are site operations “down” during AEOD process? e.g., fuel sales, store operations etc

**A:**Since all POS are logged off when AEOD is in progress, POS sales cannot occur.

**Q:**Can fuel be dispensed at the DCR during AEOD process?

**A:** “Disable Fuel”**parameter performs a “Fuel Site Pause” function. Enabling Disable Fuel prevents both new DCR and prepay fuel transactions from starting. Although new fuel sales cannot be approved while the pumps are paused, pumps currently dispensing fuel are not interrupted. The functionality does NOT wait until all fuel positions are idle before the Close Day can begin.

**Q:**What happens when there are transactions in between manual close and AEOD? Since daily close can only occur once every 24 hours, if a site performs a manual close in advance of the time scheduled for AEOD, will AEOD fail because manual close has already occurred? Can sites be given control over day close to ensure that AEOD is only invoked if manual close is not performed?

**A:**The system cannot determine that a manual close has occurred and an AEOD should not be invoked. If the site has a restriction that a day close can occur only once in 24 hours and 24 hours have not passed after a manual close, then the AEOD will fail. If there is no restriction for the interval between day close, then AEOD will happen even if a manual close has been done.

**Q:**Would the end of shift be done as part of the AEOD? And then can the cashier do an end of shift when they complete their shift?

**A:**End of shift is done as part of AEOD and when the cashier logs in, it is considered as a new shift. If there are no fixed shift timings at the site, do not enable AEOD feature and do a manual day close.

Q: Typically, a cashier closes his shift and runs the manual EOD. If the AEOD runs mid-shift, how does it impact the cashier close? Does the cashier activity have to be reconciled twice within the shift? This is a 24x7 station and shifts can vary depending on the customer load at the time of the shift change.

A: Answer to this question same as the previous question.

Q: During AEOD, what happens if there’s a power outage? Will the day close be initiated automatically when power is restored? (West Virginia is prone to power outages.)

A: AEOD will fail and the site has to do a manual close when power returns. Have a 24 hour power backup and uninterrupted power supply at the site.